Walt Whitman Bridge Anchorage Evaluation

AID scope of work for this project included obtaining more than 150 cores from inside and outside of the bridge anchorage structures on both Pennsylvania, and New Jersey sides. The material evaluation and testing analysis led by AID included:

  • Petrographic Analysis
  • Compressive Strength
  • Chloride Content
  • Estimation of the Carbonation Depth
  • Freeze and Thaw + Length Change